The site challenge
The existing surface required a practical renewal method that could accommodate vehicle movements, drainage falls and a clear parking layout.
Our approach
Unsound areas were prepared before the new surface was laid in a controlled sequence, with edges, transitions and final bay positions checked before marking.
The outcome
The finished car park has a consistent running surface, clearly defined bays and a cleaner, safer presentation for daily use.
Construction record
The work at different stages.
These images come from the A Jones project archive and show the sequence or finished details described above.



Plan a related project
Use this evidence as a starting point, not a standard specification.
Your ground, access, drainage, structure and approvals determine the right method.