Free planning calculator
Groundworks Cost Calculator
Get a rough early budget for digging, foundations, drainage and concrete. It helps you plan, but it is not a quote.
Output2 min
- 01£ planning range
- 02Excavation m³
- 03Access & risk factors
Runs in your browser · Nothing is sent
Quick answer
What drives the cost of groundworks?
Mainly how much ground is dug and removed, the length of foundation, how difficult the access is, what the ground turns out to be and how much drainage is involved. This calculator combines those factors into a rough early budget. It helps you plan, but it does not price the job.
Your inputs · 6 fields
Describe the groundworks
Change any value and the result updates instantly. Nothing is submitted or saved.
Figures are a rough guide only. They leave out design, approvals, unusual ground, contamination and anything special about your site.
Send this result with your enquiry
Use the result carefully
What this result can and cannot tell you
It can
- Show how footprint, depth and foundation length change the scale of work
- Compare scenarios, such as open versus restricted access
- Give a rough range to check early quotes against
It cannot
- Specify foundation type or depth: that needs the engineer’s design
- Allow for trees, shrinkable clay, services or contamination
- Replace a written quotation based on drawings and a visit
- 01Save what you enteredKeep what you typed in with the result, so a contractor can see what you based it on.
- 02Photograph the siteWide shots of the work area, the access route and any thresholds or levels.
- 03Send it with your enquiryAdd drawings, surveys or drain records if you have them.
About this tool
Groundworks cost questions
Straight answers before you commit. If yours is not here, ask us directly.
01Is the groundworks calculator result a quote?
No. It is a rough early range built from simple rates. A quote depends on drawings, the engineer’s foundation design, a site visit, access, the type of soil being removed and the ground actually found.
02Why does access change the range so much?
Restricted access can mean smaller machines, more handling and more trips to remove spoil. That adds labour and time even when the volume of work is the same.
03What does the ground risk setting represent?
It allows for the unknown. Surrey ground varies from sand to clay that shrinks and swells, and trees, old fill or water can change foundation depth and method. Choose complex or uncertain if you already know about any of these.
04What should I send to get an accurate price?
Drawings and any structural engineer’s design, the property postcode, photos of the work area and access route, and any known drainage information. A site visit then fills in what this calculator has to guess.

The next useful step
Ready for a real price?
Send your result with the property location, photos and any drawings. We will explain what happens next.
























