House Extensions in Surrey

Single-storey, side-return and wraparound extensions, with the foundations, drainage and structure planned early.

Area
Surrey-wide
Based
Guildford, GU2
Pricing
Survey-led
Job size
Smaller jobs welcome

The direct answer

Extensions: what matters most?

An extension is a chain of decisions that depend on each other: approvals, drainage, foundations, structure, keeping it watertight and services. We plan how these fit together before work starts, so the timetable is easier to follow and to keep to.

Our first visit looks at the things that change how the job is done and what it costs. We then put it in writing: what is included, what we have assumed, and any approvals still needed.

Covering
Guildford, Woking & all Surrey
First step
Photos or drawings, then a survey
Price basis
Written scope, not a web estimate
Contact
07414 577346 · 9am–5pm, 7 days

Guildford based · Working across Woking & Surrey

Planning an extension? Let’s look at the project.

Single-storey, side-return and wraparound extensions across Surrey. Send any drawings you have, or start with the extra space you want to create.

  • Foundations and extension drainage
  • Brickwork, openings and structural steel
  • Shell-build and wider building packages

What happens next

  1. Tell us about the job

    Where is the property, what work do you need, and when would you like to start?

  2. Send a photo or drawing

    Photos of the area and access help us understand the job. Drawings are useful if you have them, but are not needed to get in touch.

  3. Talk through the next step

    We will discuss the work with you and whether a site visit is needed before we can quote.

Call 9am–5pm, seven days a week. Smaller jobs welcome.

Finished open-plan kitchen inside a completed house extension
Ref. photo · A Jones projectFinished open-plan kitchen inside a completed house extension

Typical scope · 6 items

Typical extensions scope

One team from the ground up. Every site is different, so your written quote sets out exactly what is included.

  1. 01Groundworks, foundations and drainage
  2. 02Brickwork and new openings
  3. 03Steel beams and structural alterations
  4. 04Single-storey and side-return extensions
  5. 05Shell only or a wider building package
  6. 06Outside works and making good

Built by A Jones Contractors

Our work, close up

Photos from our own projects, from the dig to the finished job. Tap any photo to enlarge.

What can catch you out

4 things to sort out before work starts

Good planning spots problems while there is still time to change the plan, not after the concrete is poured.

  1. Approvals not sorted

    Planning, Building Regulations, Party Wall matters and who owns any sewer should be clear before work starts.

  2. Living at home

    Access, dust, keeping the house weatherproof, security and any time without water or power need a clear plan.

  3. Where things meet

    Steel beams, floor layers, drains and existing levels often all meet in one tight spot.

  4. Gaps in the quote

    A clear quote says who supplies the drawings, steels, glazing, finishes, waste removal and inspections.

How the job runs

Your job in 6 steps

Every job is different. But we always settle the details before anything is buried.

  1. 01

    Before site

    Go through your brief, drawings and approvals

  2. 02

    Before site

    Check access and the existing house

  3. 03

    Before site

    Agree the scope and allowances

  4. 04

    On site

    Plan the timetable and protection

  5. 05

    On site

    Build, with inspections at agreed stages

  6. 06

    On site

    Fix snags, record and hand over

Questions, answered

House Extensions FAQs

Straight answers before you commit. If yours is not here, ask us directly.

01

Do you build the whole extension?

We can talk about anything from groundworks and the structural shell to wider building work. The quote will make clear what is included, which specialist trades are needed and what you supply.

02

Can you work while we stay at home?

Often, yes. It depends on how much structural work there is and how long services need to be off. We agree access, screening, dust control and security before we start.

03

Do extensions always need planning permission?

No. Some fall under permitted development, but the rules and limits vary. Check the planning and Building Regulations position for your home before building starts.

04

How long does a house extension take?

A simple single-storey build often takes several months once work starts. Design, approvals, ordering materials, weather and how complex it is all change this. We give you a timetable for your project.

Got a different question? Ask about your site

The next useful step

Planning an extension? Start below ground.

Share your drawings or the space you want to create. We will talk through foundations, drainage, structure and the order of work.