Excavation & Muck-Away Calculator

Work out how much soil you will dig, how much it bulks up and roughly how many lorry loads that makes.

Output1 min

  1. 01Loose spoil m³
  2. 02In-ground m³
  3. 03Indicative loads

Runs in your browser · Nothing is sent

Quick answer

How do you work out how much spoil a dig creates?

Multiply length by width by average depth for the in-ground volume, then apply a bulking factor, because dug material takes up more space than it did in the ground. Divide the loose volume by the vehicle or skip capacity to estimate collections.

Your inputs · 5 fields

Measure the dig

Average across the whole area
Practical loose volume per collection

Change any value and the result updates instantly. Nothing is submitted or saved.

Figures are a rough guide only. They leave out design, approvals, unusual ground, contamination and anything special about your site.

Send this result with your enquiry
External groundworks under way in front of a new house in Surrey
A Jones project · SurreyGround opened up on a new build. Dug material bulks up, so there is always more to remove than the hole suggests.

Use the result carefully

What this result can and cannot tell you

It can

  • Turn simple dimensions into in-ground and bulked volumes
  • Estimate indicative collections to plan space and timing
  • Compare vehicle or skip capacities by changing one value

It cannot

  • Confirm payload: weight limits are often reached before volume
  • Classify waste: mixed or contaminated material changes disposal
  • Allow for odd shapes, sloped trench sides or digging deeper than planned
  1. 01Save what you enteredKeep what you typed in with the result, so a contractor can see what you based it on.
  2. 02Photograph the siteWide shots of the work area, the access route and any thresholds or levels.
  3. 03Send it with your enquiryAdd drawings, surveys or drain records if you have them.

About this tool

Excavation & muck-away questions

Straight answers before you commit. If yours is not here, ask us directly.

01

What is a bulking factor?

When soil is dug it loosens and occupies more volume. The calculator offers planning allowances of 1.2 for dense clay or soil, 1.3 for mixed soil and 1.4 for broken rubble or mixed fill.

02

How many grab lorry loads will I need?

Divide the loose volume by the practical capacity of the vehicle. Payload weight, fill level and material density often limit a load before its volume does, so treat the load count as indicative.

03

Does this include concrete or hardcore break-out?

Only if you include it in the dimensions and choose the rubble setting. Concrete and hardcore are dense and may be handled and disposed of separately from soil.

04

Can A Jones remove the spoil as well as dig?

Yes. Excavation and muck-away are part of our groundworks service across Surrey. Send the dimensions and photos of the access and we will suggest the most practical removal method.

Got a different question? Ask about your site

The next useful step

Ready for a real price?

Send your result with the property location, photos and any drawings. We will explain what happens next.