Unverified structure
Ceiling direction, hidden beams, chimneys and upper walls need checking against the design assumptions.
Guildford-based • Serving Woking & Surrey

Open spaces without casual risk
Load-bearing wall removal, steel installation, new openings and structural making-good delivered to the engineer’s design.
The direct answer
Structural alterations demand a controlled sequence: verify what is supported, install temporary works, form adequate bearings, place the designed steel or lintel, and only then transfer load and make good.
Our first survey focuses on the variables that change method, risk and price. The written scope then states the included work, important assumptions and the information or approvals still required.
Real A Jones project photographyTypical scope
Every site is different. The quotation—not a generic web list—defines the final package.
Built by A Jones Contractors
These are genuine project photographs from our own archive. They show the workmanship, sequencing and finished details behind this service.
Devil in the detail
Good planning makes risk visible while there is still time to change the method.
Ceiling direction, hidden beams, chimneys and upper walls need checking against the design assumptions.
The building must remain supported throughout—not only once the permanent steel is installed.
Electrical, plumbing, heating and drainage routes can change the sequence and scope.
Steel protection, junctions, floors and ceilings must be completed to the approved specification.
How the work progresses
The exact construction changes; the discipline of resolving information before burying it does not.
Review structural design and approvals
Survey structure, access and services
Plan temporary works and protection
Install support and form openings
Place steel, bearings and connections
Inspect, protect and make good
Plan with better information
Our tools organise quantities and project details without pretending to be a quotation. Results make the first survey more useful.
Frequently asked
Clear answers before commitment make the survey, quotation and build easier to compare.
For load-bearing alterations, normally yes. The engineer specifies the permanent structure and may advise on temporary works. Building Regulations approval is also usually required.
Often, but dust, noise, service disruption and temporary access can be significant. We agree a practical separation and protection plan first.
The structural sequence can be relatively short, but preparation, steel lead time, service diversions, inspections and finishing affect the full programme.
Potentially, provided the steel matches the approved design and the lifting, access, bearing and connection requirements are clear.
Continue planning

The next useful step
Send the property location, a few photos and any drawings. We will explain the most useful next survey.