The site challenge
The pipe route, depth and falls had to work within an existing surfaced area while maintaining safe access and a dependable outlet.
Our approach
The route was set out, excavated and prepared with suitable bedding before the pipework was laid, checked and protected for reinstatement.
The outcome
The completed run provides a maintainable drainage route with the below-ground work recorded before it was covered.
Construction record
The work at different stages.
These images come from the A Jones project archive and show the sequence or finished details described above.